Home / Services

One phone call for everything your UPS needs.

From installation to 2am emergency response, every job includes battery health data, runtime-risk assessment, and written documentation — the standard critical facilities expect, not the standard vendors settle for.

Service 01

UPS Installation & Commissioning

Installation and commissioning of single-phase systems to 20kVA, in rack, tower, and wall-mount configurations, with battery health and runtime-risk assessment and documentation on every install.

  • Single-phase systems to 20KVA
  • Rack-mount, tower, and wall-mount
  • Battery health and runtime-risk assessment
  • Documentation delivered at commissioning
Start with a free assessment
UPS systems
Battery service Top Tech Solutions USA replacing UPS batteries during a battery service

Service 02

Battery Replacement & Management

VRLA and gel-cell replacement using OEM-certified parts, on Florida heat-adjusted 3 to 5 year cycles that prevent the failures standard national schedules miss.

  • VRLA and gel-cell replacement
  • OEM-certified parts only
  • Florida heat-adjusted 3 to 5 year cycles
  • Catches failures standard schedules miss
Check your battery health free

Service 03

Preventive Maintenance Programs

Scheduled PM contracts with thermal imaging, battery age and health review, and runtime-risk assessment, with a written service report after every visit.

  • Scheduled PM contracts
  • Thermal imaging and battery health checks
  • Runtime verification
  • Written service report every visit
Request Free UPS Battery Health Assessment
Maintenance
Emergency Top Tech Solutions USA walking through a data center during a critical power service visit

Service 04

Emergency Power Restoration

Rapid-response deployment for critical system failures across Miami-Dade, Broward, and Palm Beach, with no out-of-state dispatch delays.

  • Rapid-response for critical failures
  • Miami-Dade, Broward, Palm Beach
  • No out-of-state dispatch delays
  • You reach the people who own the outcome
Call 786-559-7660 now

Service 05

Critical Facility Power Assessments

A no-cost UPS Battery Health Assessment for qualifying facilities, covering failure-risk scoring, runtime analysis, and a written findings report.

  • Battery health scoring
  • Runtime analysis and failure-risk review
  • Written findings report
  • $350 value, no cost, no obligation
Request Free UPS Battery Health Assessment
Assessment
Infrastructure Top Tech Solutions USA reviewing an APC Symmetra LX UPS system during a critical power assessment

Service 06

Server Room & IT Power Infrastructure

PDU management, network rack power conditioning, and data room UPS deployments for government offices and education facilities, with robust structured cabling built for high-demand environments.

  • PDU management
  • Network rack power conditioning
  • Data room UPS deployments
  • Structured cabling and rack infrastructure
Request Free UPS Battery Health Assessment

Service 07

OEM Warranty & Genuine Parts

All repairs and replacements use genuine manufacturer parts, with factory warranty protection maintained per OEM requirements. Most manufacturers — including APC/Schneider Electric and Vertiv — offer extended warranty coverage that can only be enrolled at the time of installation or within a limited window afterward. We handle that enrollment as part of every install, so you don't find out a year later that the option's already closed.

  • Genuine manufacturer parts only
  • Factory warranty protection maintained
  • Extended warranty enrollment handled at install — before the window closes
  • We recommend what's right, not what we're forced to sell
Talk to an authorized dealer
Warranty & parts
Additional capabilities

Beyond UPS, the full facility power picture

When a facility needs more than backup power, we cover the connected infrastructure too.

Power Distribution

A UPS with a bad PDU behind it is a single point of failure wearing a disguise. Rack PDU, ATS-adjacent support, and power conditioning — documented so the weak link isn't the part nobody thought to check.

Data Center & Cabling

Bad cable management doesn't fail today — it fails in eighteen months, when heat builds up in a rack nobody's checked since installation. Structured cabling and rack infrastructure built for airflow first, aesthetics second.

UPS Environment & Cooling Coordination

UPS-room temperature, airflow, and heat-exposure review, coordinated with licensed HVAC support where required.

CCTV Installation

Professional CCTV installation for reliable security and surveillance, set up for optimal performance across your site.

Consulting

Expert guidance to optimize your operations, with tailored solutions for energy efficiency, scalability, and overall performance.

Monitoring & Reporting

An alert you don't see is the same as no alert at all. Scheduled inspections and performance reporting that land in your inbox, not in a dashboard nobody logs into — so the paper trail exists before an auditor ever asks for it.

How we work

A documented process, from first visit to ongoing care

1

Assess

A no-cost battery health assessment scores risk, analyzes runtime, and delivers written findings within 48 hours.

2

Install & Service

Installation, battery replacement, or repair using OEM-certified parts, with battery health and runtime-risk assessment on completion.

3

Document

A written service report after every visit, with records prepared to support NFPA 99 and Joint Commission EC.02.05.07 documentation reviews where applicable.

4

Maintain

Scheduled preventive maintenance and rapid-response emergency restoration keep critical systems online.

Complimentary service offer

Free UPS Battery Health Assessment

A no-obligation check that scores battery health, analyzes runtime, and flags failure risk before it becomes an outage. Written findings delivered within 48 hours of the site visit.

$350 value · no cost · no obligation